Hydrojet SC Installation

Simple installation. Powerful results.

Step 1 / Cut

Measure, mark and cut the 2" pool return line. Clean the pipe and install the unions.

Step 2 / Install

Slide Hydrojet SC into the line and tighten the unions according to manufacturer instructions.

Step 3 / Start

Allow the cement to dry, restart the pump and inspect the installation for leaks and proper operation.

Technical Specifications

Minimum Flow Rate

30 GPM

Recommended Circulation

1.5–2 water turnovers per day

Recommended Maximum Flow

100 GPM

Warranty

10 Years

Connection

2 Inches

Manufacturing

Made in USA