Hydrojet SC Installation
Simple installation. Powerful results.
Step 1 / Cut






Measure, mark and cut the 2" pool return line. Clean the pipe and install the unions.
Step 2 / Install
Slide Hydrojet SC into the line and tighten the unions according to manufacturer instructions.
Step 3 / Start
Allow the cement to dry, restart the pump and inspect the installation for leaks and proper operation.
Technical Specifications
Recommended minimum Flow Rate
30 GPM
Recommended Circulation
3 water turnovers per day
Recommended Maximum Flow
100 GPM
Warranty
10 Years
Connection
2 Inches
Manufacturing
Made in USA
